The Great Roof Raising finished last week, starting with the placement of the ridge beam (2 ply LVL) on the newly-erected frame. The ridge beam runs through the centre of the house, and is designed to carry the load of the roof. We choose this design to allow for the cathedral ceiling, which maximizes interior space.
Once the ridge beam was in place, infilling the roof joists went quickly, giving the full shape of the Tiny House roof line. Since the house is designed to be mobile and on the road, there were a few additional items that had to be added to the roof to ensure it can stand up to the rigours of transportation and conditions on the road. You will see in the photos all the metal hangers and ties, which help hold everything together, nice and tightly, whether in motion or in one place standing up to wind and weather.
Sheeting the roof between snow storms was an exciting moment, as it not only gave the full sense of the height and width of the Tiny House, it brought some much-enjoyed shelter from the storms.