And then there was siding

Wow! What a great colour. The siding is almost complete and it looks great.

The combination of the grey roof, white trim and blue siding gives it a real ‘Nova Scotia Sea side’ look.

While I was working on the outside there were things going on inside too. Once the electrical was all roughed-in the Guys From Eco home insulation got in there and sprayed the walls and ceiling with 2lb, closed cell, foam insulation. This gives me an R value of around 21, plenty to keep the Tiny House cozy and warm in the middle of winter.

On the first Tiny house I did all the plumbing myself, but this time I have enlisted the help of Marc from EZ Flow plumbing in order to keep things moving along. They got the drains and vents in today and will be back tomorrow to finish the rough-in for the water lines.

It is always a bit nerve wracking for me to see people like the electricians and plumbers drilling all sorts of holes in the Tiny House I have just built, so I tend to keep a very close eye on them! I have been pleased so far with the level of care and thought that they are putting into their work, that means I can relax a bit and carry on with my jobs.

There are a few extra features in this model that were not in the last one, like a washer/dryer for example. The clients were keen to have this option and with the extra 1 1/2 feet in the bathroom there is room to put a nice 24″ condensating washer/dryer. No venting is required which makes the install quite easy.

Next up was the cedar shingles on the dormer walls. Once they were completed the outside was pretty much done…now begins all the woodwork inside.

And the Building Has Begun!

It’s been a busy week here at Howling Dog Construction, with construction starting on the Tiny Home.

Despite the cold temperatures and heavy snowfall, we were able to successfully spray foam insulate the trailer frame, which will become the floor for the Tiny Home. In order to meet the conditions required for spray foam installation, a temporary structure had to be built around the trailer to keep the weather out, and the heat in (there was a lot of ice on the trailer to melt!).

Matt also got started on the walls, starting construction outside with the long walls, and then moving into the garage due to weather to complete the end and dormer walls. Here are some pictures from this week’s progress:

Up next this week: laying the plywood for the floor and attaching it to the trailer, followed by the standing of the walls! It will be an exciting week of transformations and development, all in our driveway.